Oran Park Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Handover inspection in Oran Park

The full room by room list, taken while the final payment is still yours.

  • Two to three weeks before your handover date
  • 2 to 3 hours on site
  • Report within 24 hours
Price your Oran Park inspectionSend the address and the stage due.

Fully licensed & accredited

Stage7 of 7
When to bookTwo to three weeks before your handover date
Time on site2 to 3 hours on site
Inspected againstThe Guide to Standards and Tolerances 2017, the NCC, your contract drawings and inclusions

What is included in a Oran Park pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Oran Park builds

The honest picture from our Oran Park handovers is that the list is mostly presentation: painting defects through bathrooms, bedrooms and common areas, and infills still needed around openings. On these particular jobs the structural work had been resolved at the earlier stages, which is what you would hope to see and what makes the earlier bookings worth their fee. The exception, and it is a real one, is downlights with insulation packed against them, which is a fire risk and is reported as a safety item rather than buried in the finish list.

What we find at this stage in Oran Park

  • Downlights without the required clearance to insulation
  • Painting defects room by room
  • Door and window infills still required
  • Wet area presentation and tiling
  • Brickwork cleaning and site grading outstanding
Further bathroom finish defects, Oran Park
Further bathroom finish defects
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Oran Park

Annotated findings from Pre-handover (PCI) inspections on Oran Park builds. Client addresses withheld.

Downlight minimum clearance required, recorded during a handover inspection in Oran Park
Insulation against a downlight
General painting defects, recorded during a handover inspection in Oran Park
Painting defects in a bathroom
General painting defects, recorded during a handover inspection in Oran Park
Painting defects in a bedroom
General painting defects, recorded during a handover inspection in Oran Park
Finish defects in the common areas

The other stages of a Oran Park build

  1. Bored piers inspection in Oran Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Oran Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Oran Park3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Oran Park4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Oran Park5FixingAfter mouldings, doors and joinery, before the painter
  6. Waterproofing inspection in Oran Park6WaterproofingAfter the membrane is applied and before any tile is laid

All construction stage inspections in Oran Park →

Guides

Construction stage guides for Oran Park

All guides →

Book a pre-handover (pci) inspection in Oran Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Oran Park: common questions

Is it worth paying for a list of paint defects?

The value is in having it in writing before you pay, because afterwards it becomes a warranty claim. If that feels thin, it is a good sign: it means the earlier stages did their job.

Why single out the downlights?

Because insulation packed against a fitting that needs air around it is a fire risk, not a finish item. It gets reported separately for that reason.

Is there a return visit to check the work?

Yes. The return visit marks each item complete, partly complete or still open, and that record is what you take to handover.

How many items is typical?

Dozens on a new build is ordinary. The number that matters is the structural to cosmetic split.

And if the builder disagrees with an item?

Each entry names the clause, tolerance or standard breached. Where it cannot be settled, NSW Fair Trading comes first and NCAT after.

When should I book it?

Two to three weeks ahead of handover, so there is room to rectify and room to verify.

CallGet a Free Quote