Waterproofing inspection in Oran Park

The membrane looked at while it is still a membrane and not a floor.

  • After the membrane is applied and before any tile is laid
  • About 1 hour on site
  • Report within 24 hours
Price your Oran Park inspectionSend the address and the stage due.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane is applied and before any tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Oran Park waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Oran Park builds

The Oran Park wet area findings centre on the flange at the floor waste and on protecting the membrane once it is down. A membrane is a coating, not armour: trades walking on it, leaning ladders on it or dropping tools on it will damage it, and the damage is under tile within days. We record both the flange detail and whether the finished membrane has been protected before the tiler starts.

What we find at this stage in Oran Park

  • Flange installation and sealing at the floor waste
  • Membrane not protected before following trades
  • Damage to the applied membrane
  • Terminations short at walls and doorways
  • Falls not directing water to the waste
Sealant required at an expansion joint, Oran Park
Sealant required at an expansion joint
Sample findings

Sample defects found during our waterproofing inspections in Oran Park

Annotated findings from Waterproofing inspections on Oran Park builds. Client addresses withheld.

Flange to waterproofing, recorded during a fixing stage inspection in Oran Park
Flange at the floor waste
Flange to waterproofing, recorded during a fixing stage inspection in Oran Park
A second flange detail
Protect waterproofing membrane, recorded during a fixing stage inspection in Oran Park
Membrane needing protection before tiling
Service penetrations to be sealed and caulked, recorded during a fixing stage inspection in Oran Park
Service penetration needing sealing

The other stages of a Oran Park build

  1. Bored piers inspection in Oran Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Oran Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Oran Park3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Oran Park4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Oran Park5FixingAfter mouldings, doors and joinery, before the painter
  6. Pre-handover (PCI) inspection in Oran Park7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Oran Park →

Guides

Construction stage guides for Oran Park

All guides →

Book a waterproofing inspection in Oran Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Oran Park: common questions

What does protecting the membrane mean?

Covering it so the trades who come next do not walk on, scuff or puncture it. It is ordinary site practice and it is skipped often enough that we look for it specifically.

Why does the flange get so much attention?

Because it is the junction between the membrane and the drain, and a junction is where continuous layers stop being continuous. Get it wrong and water reaching the membrane never reaches the waste.

Which standard applies?

AS 3740 for domestic wet area waterproofing, read with the National Construction Code and ABCB Housing Provisions.

Do you flood test?

No. A flood test disturbs completed work and forms part of the waterproofer's own checks.

When can this be inspected?

In the gap after the membrane cures and before tiling starts, which is often only a couple of days.

What if the tiler has already made a start?

We look at whatever is still exposed and note which areas had already been closed up.